Home
About
Sectors
CSR
News
Careers
Contact us
Tomlinson
Follow us on Google Plus Follow us on Twitter Follow us on LinkedIn Follow us on YouTube

Sectors

Education

Think Low Carbon Centre

Client: Barnsley College
Location: Barnsley
Value: £3 million

Approach

Construction of Barnsley College’s new Think Low Carbon Centre, an internationally recognised centre of excellence in low carbon innovation.The centre provides students with a practical insight into the use of renewable technology within the construction industry. The centre also provides demonstration areas for local planners and architects to explore the use of renewable technologies.

Approach

Construction

The new two storey building includes workshops to provide practical demonstrations for students and individuals and acts as a knowledge hub for SME’s within the region to show how their carbon and energy usage can be reduced in new and existing buildings. A BREEAM ‘Excellent’ rating was achieved on this scheme.

Contract Period: 42 weeks

 

Construction

Finished Build

Winner of the Renewable Technologies Award at Celebrating Construction in South Yorkshire Awards 2012.

“G F Tomlinson were very good on this project with great attention to detail and a high level of quality delivered.”
Andrew Fairest – Director of New Build
Barnsley College

Finished Build

Sectors

Commercial

Think Low Carbon Centre

Client: Barnsley College
Location: Barnsley
Value: £3 million

Approach

Construction of Barnsley College’s new Think Low Carbon Centre, an internationally recognised centre of excellence in low carbon innovation.The centre provides students with a practical insight into the use of renewable technology within the construction industry. The centre also provides demonstration areas for local planners and architects to explore the use of renewable technologies.

Approach

Construction

The new two storey building includes workshops to provide practical demonstrations for students and individuals and acts as a knowledge hub for SME’s within the region to show how their carbon and energy usage can be reduced in new and existing buildings. A BREEAM ‘Excellent’ rating was achieved on this scheme.

Contract Period: 42 weeks

 

Construction

Finished Build

Winner of the Renewable Technologies Award at Celebrating Construction in South Yorkshire Awards 2012.

“G F Tomlinson were very good on this project with great attention to detail and a high level of quality delivered.”
Andrew Fairest – Director of New Build
Barnsley College

Finished Build