BUILDING FOR THE FUTURE

Tomlinson

BUILDING FOR THE FUTURE

Body Line

About Us

From offices in Derby, Birmingham and Worcester we cover the majority of the Midlands and South Yorkshire dealing with a multitude of differing types and sizes of project from the smallest local repair to major multi-million pound developments.

The Company was formed in 1892 by George F Tomlinson and since then the Company’s sites have been ever-present in and around the constructing activities in the East & West Midlands. The unmistakable red emblem of the G F Tomlinson Group Limited is the multi-million pound legacy which has developed from these early beginnings.

Management
Old Photo
Body Line

OUR COMPANIES

companies map
G F Tomlinson & Sons Limited

G F Tomlinson & Sons Limited

Based in Derby & Worcester undertakes all types of Construction and are experienced in:

Commercial and Industrial Construction  and Design & Build
    •    Retail 
    •    Warehouse Storage Facilities
    •    Waste Management and Processing Facilities
    •    Manufacturing Facilities
    •    Power Station Maintenance

Civil Engineering 
    •    Infrastructure Projects for Development
    •    Roads, Highways & Car Parks
    •    Public Realm and Parks
    •    Land Reclamation and Remediation Works
    •    Bridges

G F Tomlinson Building Limited

G F Tomlinson Building Limited

Based in Derby undertakes all types of Construction and are experienced in:

  • Newbuild
  • Restoration
  • Refurbishment
  • Building Maintenance
  • Design & Build
  • Education
  • Commercial
  • Leisure
  • Healthcare
  • Industrial
  • Retail
Company 1

G F Tomlinson Birmingham Limited

Based in Birmingham undertakes all types of Construction and are experienced in:

  • Newbuild
  • Restoration
  • Refurbishment
  • Building Maintenance
  • Design & Build
  • Education
  • Commercial
  • Leisure
  • Healthcare
  • Industrial
  • Retail
{image_title}

G F Tomlinson & Sons Limited

Based in Derby & Worcester undertakes all types of Construction and are experienced in:

Commercial and Industrial Construction  and Design & Build
    •    Retail 
    •    Warehouse Storage Facilities
    •    Waste Management and Processing Facilities
    •    Manufacturing Facilities
    •    Power Station Maintenance

Civil Engineering 
    •    Infrastructure Projects for Development
    •    Roads, Highways & Car Parks
    •    Public Realm and Parks
    •    Land Reclamation and Remediation Works
    •    Bridges

Commercial

LG Arena LG Arena LG Arena
enlarge Enlarge Image

LG Arena

Client: National Exhibition Centre
Value: £13.75m
Location: Birmingham

This Design & Build project ran to a tight 30 week fast track programme.

The finished forum provides a pre-event party gathering area, which include bars, fast food outlets, Michelin star fine dining restaurants and a VIP party deck.

Westthorpe Innovation Centre Westthorpe Innovation Centre Westthorpe Innovation Centre
enlarge Enlarge Image

Westthorpe Innovation Centre

Client: North East Derbyshire District Council
Value: £3.5m
Location: Killamarsh, Sheffield

This D&B project comprised of two new two storey steel frame buildings, providing 30 office units with sustainable features.

The scheme achieved a ‘Very Good’ BREEAM rating.

West Bromwich Crematorium West Bromwich Crematorium West Bromwich Crematorium
enlarge Enlarge Image

West Bromwich Crematorium

Client: Sandwell Metropolitan Borough Council
Value: £2m
Location: West Bromwich

This project involved the construction of a new crematorium and alterations to the existing building with landscaping works and car park extension.

The new crematorium meets new mercury abatement legislation.

Education

Nottingham High School Nottingham High School Nottingham High School
enlarge Enlarge Image

Nottingham High School

Client: Nottingham High School
Value: £3m
Location: Nottingham

This project involved the construction of a new 3 storey sixth form centre and 500 capacity dining hall.

The new accommodation will consist of a kitchen/servery, dining hall, classrooms, offices, cyber café, large bright social areas and lecture theatre with storage and plant areas.

Regency High School Regency High School Regency High School
enlarge Enlarge Image

Regency High School

Client: Worcestershire County Council
Value: £4.5m
Location: Worcester

Regency High School is a special school for children aged 11-19 with various disabilities.

This project involved a phased construction of four new extensions which provided a new classroom blocks, new hydrotherapy pool, new sports hall and a small class room extension.

Thornton Junior School Thornton Junior School Thornton Junior School
enlarge Enlarge Image

Thornton Junior School

Client: Birmingham City Council
Value: £2.8m
Location: Birmingham

This project included a two storey teaching block extension. The works also involved a further single storey changing block extension along with associated drainage, external works, fencing and landscaping.

This project won Considerate Contractors Scheme 2010 National Silver Award.

Environmental

Waste Composting Facility Waste Composting Facility Waste Composting Facility
enlarge Enlarge Image

Waste Composting Facility

Client: Biffa Waste Services Limited
Value: £4.5m
Location: Ufton, Leamington Spa

This project involved the construction of a new composting vessel with technology capable of processing 40,000 tonnes per annum of type three green waste.

The new site incorporates an environmental control system, an external apron yard slab, drainage systems with 2 weighbridges and a separate stand-alone office facility.

Conkers Youth Hostel Conkers Youth Hostel Conkers Youth Hostel
enlarge Enlarge Image

Conkers Youth Hostel

Client: The National Forest
Value: £3.2m
Location: Moira, Derbyshire

This new build youth hostel included 75 bedrooms, catering facilities, living space and external facilities. Many sustainable features where incorporated into the building and the scheme won the Best Sustainable Project for 2008 in the East Midlands for both RICS and RIBAMidlands for both RICS and RIBA

Elephant Paddock Elephant Paddock Elephant Paddock
enlarge Enlarge Image

Elephant Paddock

Client: Twycross Zoo
Value: £1m
Location: Leicestershire

This scheme for Twycross included the remodeling of the existing elephant paddock. Work involved extensive excavations and the construction of a new 2.5m deep perimeter security moat.

The moat, prior to completion was filled with 170,000 gallons of water which took 3 days to achieve.

HEALTH CARE

The Den – Children’s Hospital The Den – Children’s Hospital The Den – Children’s Hospital
enlarge Enlarge Image

The Den – Children’s Hospital

Client: Chesterfield & North Derbyshire
Royal Hospital
Value: £3.6m
Location: Chesterfield

This scheme involved the strip out, alterations and refurbishment of the existing Nightingale Ward.

The project also involved a 3-storey new build extension to form accommodation for Paediatric use.site.

Bluebell Park Care Home Bluebell Park Care Home Bluebell Park Care Home
enlarge Enlarge Image

Bluebell Park Care Home

Client: Barchester Healthcare
Value: £3.7m
Location: Derby

This project involved the construction of a new three storey care home. The facilities included 64 bedrooms with en-suites, living areas, catering facilities, a salon and garden area.

The care home was constructed from timber frame, brick, render and cedar clad.

Park Hospital Park Hospital Park Hospital
enlarge Enlarge Image

Park Hospital

Client: BMI Healthcare
Value: £2.2m
Location: Nottingham

This £2.2m project for BMI Healthcare involves the extension to and refurbishment of an existing Theatre Department including Theatres, Endoscopy, Intensive Care Unit, Recovery and Stores.

The scheme also involves associated electrical and mechanical work, landscaping and car parking.

Housing

Retrofitting for the Future Retrofitting for the Future Retrofitting for the Future
enlarge Enlarge Image

Retrofitting for the Future

Client: Technology Strategy Board
Value: {value}
Location: Birmingham

This project was part of the Retrofit for the Future competition initiative instigated by the Government. Elements include:
Photovoltaic panels, Solar Hot water panels,Triple glazed windows, Improvements in air tightness, External Structherm insulated render, New roof and roof insulation, New state of the art heating control system.

Lyndhurst Estate Lyndhurst Estate Lyndhurst Estate
enlarge Enlarge Image

Lyndhurst Estate

Client: Birmingham City Council
Value: £10.5m
Location: Birmingham

The project involved improvement works on 5 sets of 13 storey tower blocks including structural improvements, re-roofing, securing doors, heating, soil & vent replacement, re-wiring, insulated render, curtain walling, new windows and digital aerials.

The Arboretum The Arboretum The Arboretum
enlarge Enlarge Image

The Arboretum

Client: Northern Counties Housing Association
Value: £2m
Location: Nottingham

This project entailed the refurbishment of 15 no. flats and communal areas.

Works included fire alarms, central heating, windows, re-wiring, sound insulation, carpets, new kitchens and redecoration.

Industrial

Ferrybridge Power Station Ferrybridge Power Station Ferrybridge Power Station
enlarge Enlarge Image

Ferrybridge Power Station

Client: Scottish and Southern Energy
Value: £various
Location: Knottingley, Yorkshire

Various projects have been carried over recent years on site at Ferrybridge.

The latest project included a replacement purge main was laid to discharge water used in the cooling process into a nearby river and a new site access road joining the main entrance and a new car park.

Central Stores Facility and Offices Central Stores Facility and Offices Central Stores Facility and Offices
enlarge Enlarge Image

Central Stores Facility and Offices

Client: English, Welsh & Scottish Railways
Value: £1.8m
Location: Toton, Nottinghamshire

This project consists of a new facility for EWS which provided a high bay facility with offices and a category one floor slab to facilitate computerised warehousing.

The project also included large scale remediation of the site prior to development, external works, access roads and security provisions.

Casepak Recycling Facility Casepak Recycling Facility Casepak Recycling Facility
enlarge Enlarge Image

Casepak Recycling Facility

Client: Casepak Limited
Value: £7.2m
Location: Leicester

This project involved the construction of a 140,000sq ft warehouse and a 5,000sq ft office facility.

Externally the facility includes loading bays, compactor house, glass bay, pumping house, balancing pond, sprinkler tanks and a switch compound and car parking.

Leisure

Vaughan Parry Williams Sports Pavilion Vaughan Parry Williams Sports Pavilion Vaughan Parry Williams Sports Pavilion
enlarge Enlarge Image

Vaughan Parry Williams Sports Pavilion

Client: The University of Nottingham
Value: £1.3m
Location: Nottingham

This project involved the D&B of a new sports pavilion with a number of changing facilities, bar and tea rooms, storage rooms and a training room.

The pavilion involved many sustainable features including rainwater harvesting and a solar thermal pre-heat system.

Wednesfield Library Wednesfield Library Wednesfield Library
enlarge Enlarge Image

Wednesfield Library

Client: Wolverhampton City Council
Value: £2m
Location: Wolverhampton

This D&B scheme has provided a new state of the art library facility for the local community.

The facility provides reading and research areas along with IT suites and conference rooms.

Rebecca Adlington Swimming Centre Rebecca Adlington Swimming Centre Rebecca Adlington Swimming Centre
enlarge Enlarge Image

Rebecca Adlington Swimming Centre

Client: Mansfield District Council
Value: £4.5m
Location: Mansfield

This £4.5m project involves the refurbishment of two swimming pools and extending one of them from 4 to 6 lanes. The pool hall will also be refurbished together with the demolition of the existing changing rooms.

A new build extension will be built alongside the existing building to form a new changing village and gymnasium facility.

Tomlinson Energy

Body Line

renewable-technologies

Tomlinson Energy offers the retrofit and renewables market our expertise to understand the complexities of renewable energy technologies, intended to reduce the dependence upon fossil fuels and to help meet carbon emission reduction targets.

Tomlinson Energy is a Microgeneration Certification Scheme Accredited Company, acting as the renewable technology business development arm for the group. Our dedicated in-house team can provide you with the right sustainable energy solution for the following types of installation for both commercial and domestic applications:

  • Solar Photovoltaic panel energy generation
  • Solar hot water panels
  • Ground source heating and hot water
  • Air source heating and hot water
  • Biomass boilers
  • Sedum roof
  • Wind source energy generation
  • District heating systems
  • Retrofit through schemes such as Birmingham Energy savers and the proposed Green Deal

View our Renewable Energy Projects
Renewable Technologies

Tomlinson Energy

Wellington Civic Quarter Wellington Civic Quarter Wellington Civic Quarter
enlarge Enlarge Image

Wellington Civic Quarter

Client: Wellington Civic Quarter
Value: £8.2m
Location: Telford

This development project will include:
New library with two floors of offices above.

New single storey registry office building with attached garden area.

Refurbished Leisure Centre Facilities.

New joint reception area with café facilities
Set to achieve a BREEAM ‘very good’ rating.

Retrofitting for the Future Retrofitting for the Future Retrofitting for the Future
enlarge Enlarge Image

Retrofitting for the Future

Client: Technology Strategy Board
Value: -
Location: Birmingham

This project was part of the Retrofit for the Future competition initiative instigated by the Government. Elements include:
Photovoltaic panels, Solar Hot water panels,Triple glazed windows, Improvements in air tightness, External Structherm insulated render, New roof and roof insulation, New state of the art heating control system.

Blackheath Library Blackheath Library Blackheath Library
enlarge Enlarge Image

Blackheath Library

Client: Black Country Housing Ltd
Value: £3.5m
Location: Black Heath

Blackheath Library project is a combined office and library development and involves a construction of a dual use 3 storey building.

This building is designed to achieve BREEAM ‘Excellent’ rating, incorporating many environmental features: living roof, rainwater recovery and sustainable drainage system.

Body Line

Restoration

Westfield Folkhouse Westfield Folkhouse Westfield Folkhouse
enlarge Enlarge Image

Westfield Folkhouse

Client: Nottinghamshire County Council
Value: £6.5m
Location: Mansfield

This project involved the restoration and refurbishment of a Grade II Listed building, creating a world class young people’s centre in the heart of Mansfield, Nottinghamshire.

The project includes an extension over two floors which houses rooms for multi-media gaming zones, music and dance.

Buxton Pavilion Arts Centre Buxton Pavilion Arts Centre Buxton Pavilion Arts Centre
enlarge Enlarge Image

Buxton Pavilion Arts Centre

Client: High Peak Borough Council
Value: £2.1m
Location: Buxton

This project has transformed the dated little used Grade II Listed pavilion into a high profile 462 seat art centre.

Original features including the vaulted ceiling and balcony were sensitive restored and complemented by the latest performance and presentation facilities.

Bilston Town Hall Bilston Town Hall Bilston Town Hall
enlarge Enlarge Image

Bilston Town Hall

Client: Wolverhampton City Council
Value: £1.6m
Location: Wolverhampton

This Grade II Listed building project included getting the original clock ticking again, refurbishing the ballroom and stage to its former glory, restoring and repairing the roof, chimneys and stonework.

Retail

Retail Outlet Retail Outlet Retail Outlet
enlarge Enlarge Image

Retail Outlet

Client: Lidl GmbH
Value: £1.2m
Location: Coventry

This project involved the D&B of a 1,700m2 retail outlet with an 80 space car parking facility, service yard and loading bay.

The project was delivered on a fast track 21 week programme.

Retail Outlet Retail Outlet Retail Outlet
enlarge Enlarge Image

Retail Outlet

Client: Sainsburys
Value: £4.1m
Location: Wombourne, Wolverhampton

This D&B project consisted of a new 38,000 sq ft supermarket with car parking spaces for 234 vehicles.

The works included rainwater harvesting and sustainable drainage together with a new highway junction to access the store.

Wickes and Aldi Retail Units Wickes and Aldi Retail Units Wickes and Aldi Retail Units
enlarge Enlarge Image

Wickes and Aldi Retail Units

Client: Liberty Mercian Developments Limited
Value: £4.1m
Location: Telford

This project involves the design and construction of 47,320 sq ft of retail floor area with a 182 space car parking facility.

The new units will provide retail space for Wickes and a Aldi Store.

SUSTAINABILITY

Village Primary School Village Primary School Village Primary School
enlarge Enlarge Image

Village Primary School

Client: Derby Council, Derby
Value: £7m BREEAM: Very Good
Sustainable Features:

Biomass Boiler, Rainwater Harvesting, Sedum Roof.

This project consisted of a single storey unit comprising 15 classrooms, reception, offices, nursery unit, kitchen, main hall, library, toilets stores and main plant room and associated buildings.

Sustainable Projects
enlarge Enlarge Image

Sustainable Projects

A sample of our experience over the various aspects of sustainability are shown in the chart above.

Creswell Crags Visitors Centre Creswell Crags Visitors Centre Creswell Crags Visitors Centre
enlarge Enlarge Image

Creswell Crags Visitors Centre

Client: Creswell, Worksop
Value: £3.8m BREEAM: Very Good
Sustainable Features:

Ground Source Heating, Rainwater Harvesting.

This development created a centre for excellence for telling the Ice Age Story of this archaeological site with art displays, a research and library room and space for education groups and conference facilities.

Transportation Bridges & Structures

Ring Road Re-development Ring Road Re-development Ring Road Re-development
enlarge Enlarge Image

Ring Road Re-development

Client: Derby Riverlights Limited
Value: £3.0m
Location: Derby

This project involved the substantial re-configuration of Derby’s busy inner ring road to provide a gateway to the major £300 million retail and leisure development. Works also included new highways, footways, landscaped areas, traffic and pedestrian facilities, lighting, furniture, drainage and utilities services.

Willington Marina Willington Marina Willington Marina
enlarge Enlarge Image

Willington Marina

Client: Mercia Marina
Value: £1.5m
Location: Willington, Derby

This project involved the design and construction of a new bridge and hard and soft landscaping
As part of the initial phases of development, this project required highway alterations to the nearby junctions.

Shirebrook Colliery Shirebrook Colliery Shirebrook Colliery
enlarge Enlarge Image

Shirebrook Colliery

Client: East Midlands Development Agency
Value: £6.7m
Location: Shirebrook, Derbyshire

This project involved the construction of a new 1.50km long and 7.30m wide carriageway link road into the former Shirebrook Colliery site.

The scheme also included enabling works, drainage, lighting and major infrastructure.

CAREERS

Body Line

Careers

Training is central to the Tomlinson ethos. We're committed to all aspects of personal and career development right across the group, from training students considering a career in the construction industry to making sure our staff are given every opportunity to bring out their full potential.

We also believe that, wherever possible, it's vital to promote from within when a vacancy comes up. It's important to our staff because they know they can realise their career ambitions with Tomlinson's. And it's important to us because holding on to a dedicated and highly qualified team is the surest way of satisfying the endlessly diverse needs of our clients.

Click here to view our latest vacancies
Careers

CAREERS

Body Line

Technical Trainees

The Tomlinson Group have placements aimed at students coming to the end of their secondary education who wish to embark upon a career in the construction industry.

Successful applicants will be employed to work alongside professionals in key areas of the business including; Estimating, Quantity Surveying and Contracts Management whilst undertaking an appropriate course in Construction on a day release basis.

We are looking for bright enthusiastic individuals with strong GCSE’s grades (including Maths, Science and English) to join the scheme.

All Technical Trainee placements have now been made for 2011. No vacancies will be available unitl summer 2012.

Careers

CAREERS

Body Line

Trade Apprenticeships

Our three year apprenticeships in joinery, bricklaying and construction allow you to develop your skills by working alongside our skilled and experienced crafts people whilst studying your City & Guilds chosen craft. Interviews for candidates who have passed an assessment exam will be in June/July with a view to an appointment by the 1st September in readiness for the start of the College academic year.

Derby

All Trade Apprenticeship placements have now been made for 2011 and 2012. No vacancies will therefore be available unitl Summer 2013.

Birmingham

All Trade Apprenticeship placements have now been made for 2011 and 2012. No vacancies will therefore be available unitl Summer 2012.

{image_title}

Vacancies

Body Line

Vacancies

{image_title}
Body Line Page: Body Line

VALUES

Body Line

Respect for People

Respecting the benefits of working with good employees, sub-contractors and clients, and considering the wider community during our activities.

Quality

Caring for our clients and our people in the delivery of measurable outcomes on time and within budget.

Expertise

Promoting knowledge based solutions that can complement and add real value to a client’s construction, building refurbishment or civil engineering project. experience.

Professional

Qualified recommendations and working practices through the employment of intelligent, highly skilled people working together as a team.

Integrity

Protecting our reputation with an honest and fair approach to the way we conduct our business relationships.

Innovation

Exceeding client expectations in delivering focused building or civil engineering solutions relevant to the overall brief.

Flexibility

Creating positive recommendations to changing requirements, adding value to the client.

{image_title}
Body Line

NEWS

Body Line

23.04.12 - A Practical Educational Experience for Construction Students

G F Tomlinson are nearing completion of the £7million Institute of Mental Health building located at The University of Nottingham’s Jubilee Campus, a facility for innovative research and pioneering… read more

22.03.12 - Restoration Man is Thinking Low Carbon

The newly completed Think Low Carbon Centre at Barnsley College was officially opened by Frank Johnston Chair of Governors, Lord Redesdale and Channel 4’s very own Restoration Man, George Clarke. The Centre’s… read more

02.02.12 - Mr Sprag - 99 and Always out

Birmingham resident, Mr. Spragg couldn’t believe his eyes when employees from G F Tomlinson Birmingham Ltd arrived at his home with a card signed by the Director, balloons and a birthday cake, as a surprise… read more

News

NEWS

Body Line

23.01.12 - £1.9 million revamp for Eastgate

Work is to start on a £1.9 million scheme of improvements at the Eastgate Day Services centre in Worksop. Nottinghamshire County Council is totally transforming the centre at Albion Close as… read more

03.01.12 - Pledging to deliver construction skills for the future

27 local companies have pledged to boost skills training for young people with a view to delivering construction and housing improvements including sustainable “green” technologies in more homes and… read more

16.11.11 - Derby Company are all Heart in Colleagues Memory

A team of thirty eight friends, family members and colleagues of a Derby man who died of a heart attack in February are taking on a challenge in his memory. Twenty-nine employees from GF Tomlinson, in… read more

News

NEWS

Body Line

11.11.11 - Demolition starts for the New Cornerstone Church

Peter Lewis, Senior minister of Cornerstone Church started the demolition process of the old MFI building on Castle Boulevard, with church staff and representatives of G F Tomlinson Building Limited to signal… read more

10.10.11 - G F Tomlinson began works on the new RSPCA Centre

One of the largest local construction companies G F Tomlinson Birmingham Limited helps to make history as they have been appointed as a principal contractor to build the new RSPCA flagship centre and hospital… read more

01.09.11 - IMH News - An Update on the Institute of Mental Health Project, Nottingham

G F Tomlinson are working with The University of Nottingham and Nottinghamshire Healthcare Trust to provide a new facility for The Institute of Mental Health. Please see the attachment below - IMH… read more

News

NEWS

Body Line

28.07.11 - New £1m Centre Boosts Tramway Attraction

THE man who introduced trams to Britain was an American... called George Train and trams were needed to replace horses because of the piles of dung the animals left in the streets. You might not know these… read more

20.07.11 - G F Tomlinson Team up in the Community

Staff at G F Tomlinson and the University of Derby ditched their day jobs, put on their gardening gloves and volunteered their time on Monday 4th July at Beaufort Community Primary School in Derby to create an… read more

27.05.11 - Work Commences on the New Home for the Institute of Mental Health

One out of Four people throughout the East Midlands could benefit from the new building for the Institute of Mental Health which helps transform the understanding and treatment of mental illness. … read more

News

NEWS

Body Line

08.04.11 - Start date set for Chase Leisure Centre work

A start date has been set for work on the major modernisation and refurbishment of Chase Leisure Centre with construction contractor G F Tomlinson Building Limited starting work at the leisure centre in… read more

News
Body Line
Page: Body Line

POLICIES

Body Line

Health, safety, environmental & quality

The Tomlinson Group has an Integrated Management System that links Environmental (BS EN ISO 14001), Quality (BS EN ISO 9001) and Health and Safety (OHSAS 18001) under the UKAS accredited system, giving equal importance to each other in the construction process. It deals with all aspects of Health, Safety, Environmental & Quality all under a single policy. It is a fully integrated system approved by UKAS accredited external auditors.

{image_title}

POLICIES

Body Line

Corporate Social Responsibility

As part of our commitment to Corporate Social Responsibility we use modern methods of construction wherever possible so that our construction activities have the least effect on the proximity of the area. It also extends to our staff by giving added value to their employment and also to the local communities where we work, as well as neighbouring occupants.

"On behalf of the Bonsall & Derbyshire Dales Link of Chernobyl Children Life Line, I would like to thank Tomlinson's very much once again for sponsoring our charity. As a volunteer children's charity group, we would find it very difficult to be able to keep going with our work without the support of companies like yours." Chris Broome, Chernobyl Children Life Line Charity

"I am writing to inform you that I have found Tomlinson's to have been thoughtful and have worked hard to ensure that the large construction project being undertaken has had little impact as possible on the day to day running of the school." Mrs R E Lawrence, Head Teacher, St Alban's Church of England Primary School.

CORPORATE SOCIAL RESPONSIBILITY

POLICIES

Body Line

Community care policy

Many people are affected when construction work moves into their area. They can be affected by noise, dust, fumes, additional traffic, pavement congestion and road closures, amongst other nuisance factors. However the Tomlinson Group has a Community Care Policy in place to minimise all their construction activities within the vicinity of their operations.

 

Code of Conduct

POLICIES

Body Line

Equality

The company is an Equal Opportunities Employer and our policy is in line with the requirements of the new Equality Act 2010, which became law on the 1st October 2010. Our aim is to ensure that no job applicant, employee or other third party is the subject of discrimination, harassment, victimisation or receives less favourable treatment on the grounds of age, disability, gender reassignment, marriage and civil partnership, race, religion or belief, sex or sexual orientation.

Our policy is continually monitored and reviewed to ensure we remain fully compliant and committed to a programme of action so that we make this policy truly effective.

 

People
Body Line Page: Body Line

CONTACT US

Body Line

G F Tomlinson Group Ltd

Tomlinson House
Duffield Road
Little Eaton
Derby. DE21 5DR
T: 01332 833100 - F: 01332 830357 - View map

G F Tomlinson & Sons Ltd

Tomlinson House
Duffield Road
Little Eaton
Derby. DE21 5DR
T: 01332 831600 - F: 01332 833987 - View map

G F Tomlinson Building Ltd

Tomlinson House
100 Alfreton Road
Derby
DE21 4AG
T: 01332 342202 - F: 01332 227589 - View map

G F Tomlinson & Sons Ltd

Tomlinson House
Rainbow Hill
Worcester
WR3 8LX
T: 01905 610041 - F: 01905 734827 - View map

G F Tomlinson Birmingham Ltd

329 Tyburn Road
Erdington.
Birmingham. B24 8HJ
T: 0121 327 2660 - F: 0121 327 3110 - View map

GET IN TOUCH

Body Line





Body Line Page: Body Line