BUILDING FOR THE FUTURE
About Us
From offices in Derby, Birmingham and Worcester we cover the majority of the Midlands and South Yorkshire dealing with a multitude of differing types and sizes of project from the smallest local repair to major multi-million pound developments.
The Company was formed in 1892 by George F Tomlinson and since then the Company’s sites have been ever-present in and around the constructing activities in the East & West Midlands. The unmistakable red emblem of the G F Tomlinson Group Limited is the multi-million pound legacy which has developed from these early beginnings.
OUR COMPANIES
G F Tomlinson & Sons Limited
Based in Derby & Worcester undertakes all types of Construction and are experienced in:
Commercial and Industrial Construction and Design & Build
• Retail
• Warehouse Storage Facilities
• Waste Management and Processing Facilities
• Manufacturing Facilities
• Power Station Maintenance
Civil Engineering
• Infrastructure Projects for Development
• Roads, Highways & Car Parks
• Public Realm and Parks
• Land Reclamation and Remediation Works
• Bridges
G F Tomlinson Building Limited
Based in Derby undertakes all types of Construction and are experienced in:
- Newbuild
- Restoration
- Refurbishment
- Building Maintenance
- Design & Build
- Education
- Commercial
- Leisure
- Healthcare
- Industrial
- Retail
G F Tomlinson Birmingham Limited
Based in Birmingham undertakes all types of Construction and are experienced in:
- Newbuild
- Restoration
- Refurbishment
- Building Maintenance
- Design & Build
- Education
- Commercial
- Leisure
- Healthcare
- Industrial
- Retail
G F Tomlinson & Sons Limited
Based in Derby & Worcester undertakes all types of Construction and are experienced in:
Commercial and Industrial Construction and Design & Build
• Retail
• Warehouse Storage Facilities
• Waste Management and Processing Facilities
• Manufacturing Facilities
• Power Station Maintenance
Civil Engineering
• Infrastructure Projects for Development
• Roads, Highways & Car Parks
• Public Realm and Parks
• Land Reclamation and Remediation Works
• Bridges
Commercial
LG Arena
| Client: | National Exhibition Centre |
| Value: | £13.75m |
| Location: | Birmingham |
This Design & Build project ran to a tight 30 week fast track programme.
The finished forum provides a pre-event party gathering area, which include bars, fast food outlets, Michelin star fine dining restaurants and a VIP party deck.
Westthorpe Innovation Centre
| Client: | North East Derbyshire District Council |
| Value: | £3.5m |
| Location: | Killamarsh, Sheffield |
This D&B project comprised of two new two storey steel frame buildings, providing 30 office units with sustainable features.
The scheme achieved a ‘Very Good’ BREEAM rating.
West Bromwich Crematorium
| Client: | Sandwell Metropolitan Borough Council |
| Value: | £2m |
| Location: | West Bromwich |
This project involved the construction of a new crematorium and alterations to the existing building with landscaping works and car park extension.
The new crematorium meets new mercury abatement legislation.
Education
Si Yuan Centre
| Client: | University of Nottingham |
| Value: | £3.1m |
| Location: |
G F Tomlinson have constructed a new low carbon building for the School of Contemporary Chinese Studies. Located on the University of Nottingham’s Jubilee Campus, the building named the ‘Si Yuan Centre’ provides high quality office, teaching and learning spaces.
King Edward VI School
| Client: | {client} |
| Value: | £1.1m |
| Location: | Birmingham |
This project involved construction of a new library at the fully occupied and functional King Edward VI School.
Insitute of Mental Health
| Client: | University of Nottingham |
| Value: | £7.0m |
| Location: | Nottingham |
This £4.5m project involved the design and build of a new facility for the Institute of Mental Health.
The facility will provide accommodation over 4 floors. The main uses of the facility are a combination of administrative and faculty office spaces, with ancillary meeting and seminar accommodation.
Environmental
Waste Composting Facility
| Client: | Biffa Waste Services Limited |
| Value: | £4.5m |
| Location: | Ufton, Leamington Spa |
This project involved the construction of a new composting vessel with technology capable of processing 40,000 tonnes per annum of type three green waste.
The new site incorporates an environmental control system, an external apron yard slab, drainage systems with 2 weighbridges and a separate stand-alone office facility.
Conkers Youth Hostel
| Client: | The National Forest |
| Value: | £3.2m |
| Location: | Moira, Derbyshire |
This new build youth hostel included 75 bedrooms, catering facilities, living space and external facilities. Many sustainable features where incorporated into the building and the scheme won the Best Sustainable Project for 2008 in the East Midlands for both RICS and RIBAMidlands for both RICS and RIBA
Elephant Paddock
| Client: | Twycross Zoo |
| Value: | £1m |
| Location: | Leicestershire |
This scheme for Twycross included the remodeling of the existing elephant paddock. Work involved extensive excavations and the construction of a new 2.5m deep perimeter security moat.
The moat, prior to completion was filled with 170,000 gallons of water which took 3 days to achieve.
HEALTH CARE
College Road Medical Centre
| Client: | Dr Horton & Partners |
| Value: | £1.8m |
| Location: | Birmingham |
This project consists of design and construction of a two storey medical centre in Kingstanding, Birmingham
This project involves medical centre, pharmacy building and associated works: access road, public and private car park areas, drainage, external lighting, retaining structures and services.
The Park Hospital
| Client: | BMI Healthcare |
| Value: | £2.2m |
| Location: | Nottingham |
This project involved the extension and refurbishment of an existing Theatre Department.
The works had to be undertaken on a live occupied site and the hospital remained fully operational.
Chesterfield Hospital Eye Centre
| Client: | {client} |
| Value: | £1.5m |
| Location: | Chesterfield |
Patients undergoing treatment for age related macular degeneration, diabetic retinopathy, glaucoma and emergency care now are treated in one dedicated unit.
Housing
Retrofitting for the Future
| Client: | Technology Strategy Board |
| Value: | {value} |
| Location: | Birmingham |
This project was part of the Retrofit for the Future competition initiative instigated by the Government. Elements include:
Photovoltaic panels, Solar Hot water panels,Triple glazed windows, Improvements in air tightness, External Structherm insulated render, New roof and roof insulation, New state of the art heating control system.
Ankerdine & Brendon Courts
| Client: | Dudley Metropolitan Borough Council |
| Value: | £590k |
| Location: | Dudley |
This housing scheme involved replacement of windows, balcony doors, brick slips & concrete repairs to both high rise accommodation at Ankerdine & Brendon Courts, located on the busy housing estate in Halesowen.
The Arboretum
| Client: | Northern Counties Housing Association |
| Value: | £2m |
| Location: | Nottingham |
This project entailed the refurbishment of 15 no. flats and communal areas.
Works included fire alarms, central heating, windows, re-wiring, sound insulation, carpets, new kitchens and redecoration.
Industrial
Ferrybridge Power Station
| Client: | Scottish and Southern Energy |
| Value: | £various |
| Location: | Knottingley, Yorkshire |
Various projects have been carried over recent years on site at Ferrybridge.
The latest project included a replacement purge main was laid to discharge water used in the cooling process into a nearby river and a new site access road joining the main entrance and a new car park.
Central Stores Facility and Offices
| Client: | English, Welsh & Scottish Railways |
| Value: | £1.8m |
| Location: | Toton, Nottinghamshire |
This project consists of a new facility for EWS which provided a high bay facility with offices and a category one floor slab to facilitate computerised warehousing.
The project also included large scale remediation of the site prior to development, external works, access roads and security provisions.
Casepak Recycling Facility
| Client: | Casepak Limited |
| Value: | £7.2m |
| Location: | Leicester |
This project involved the construction of a 140,000sq ft warehouse and a 5,000sq ft office facility.
Externally the facility includes loading bays, compactor house, glass bay, pumping house, balancing pond, sprinkler tanks and a switch compound and car parking.
Leisure
Vaughan Parry Williams Sports Pavilion
| Client: | The University of Nottingham |
| Value: | £1.3m |
| Location: | Nottingham |
This project involved the D&B of a new sports pavilion with a number of changing facilities, bar and tea rooms, storage rooms and a training room.
The pavilion involved many sustainable features including rainwater harvesting and a solar thermal pre-heat system.
Wednesfield Library
| Client: | Wolverhampton City Council |
| Value: | £2m |
| Location: | Wolverhampton |
This D&B scheme has provided a new state of the art library facility for the local community.
The facility provides reading and research areas along with IT suites and conference rooms.
Rebecca Adlington Swimming Centre
| Client: | Mansfield District Council |
| Value: | £4.5m |
| Location: | Mansfield |
This £4.5m project involves the refurbishment of two swimming pools and extending one of them from 4 to 6 lanes. The pool hall will also be refurbished together with the demolition of the existing changing rooms.
A new build extension will be built alongside the existing building to form a new changing village and gymnasium facility.
renewable-technologies
Tomlinson Energy offers the retrofit and renewables market our expertise to understand the complexities of renewable energy technologies, intended to reduce the dependence upon fossil fuels and to help meet carbon emission reduction targets.
Tomlinson Energy is a Microgeneration Certification Scheme Accredited Company, acting as the renewable technology business development arm for the group. Our dedicated in-house team can provide you with the right sustainable energy solution for the following types of installation for both commercial and domestic applications:
- Solar Photovoltaic panel energy generation
- Solar hot water panels
- Ground source heating and hot water
- Air source heating and hot water
- Biomass boilers
- Sedum roof
- Wind source energy generation
- District heating systems
- Retrofit through schemes such as Birmingham Energy savers and the proposed Green Deal
View our Renewable Energy Projects
Wellington Civic Quarter
| Client: | Wellington Civic Quarter |
| Value: | £8.2m |
| Location: | Telford |
This development project will include:
New library with two floors of offices above.
New single storey registry office building with attached garden area.
Refurbished Leisure Centre Facilities.
New joint reception area with café facilities
Set to achieve a BREEAM ‘very good’ rating.
Retrofitting for the Future
| Client: | Technology Strategy Board |
| Value: | - |
| Location: | Birmingham |
This project was part of the Retrofit for the Future competition initiative instigated by the Government. Elements include:
Photovoltaic panels, Solar Hot water panels,Triple glazed windows, Improvements in air tightness, External Structherm insulated render, New roof and roof insulation, New state of the art heating control system.
Blackheath Library
| Client: | Black Country Housing Ltd |
| Value: | £3.5m |
| Location: | Black Heath |
Blackheath Library project is a combined office and library development and involves a construction of a dual use 3 storey building.
This building is designed to achieve BREEAM ‘Excellent’ rating, incorporating many environmental features: living roof, rainwater recovery and sustainable drainage system.
Restoration
Westfield Folkhouse
| Client: | Nottinghamshire County Council |
| Value: | £6.5m |
| Location: | Mansfield |
This project involved the restoration and refurbishment of a Grade II Listed building, creating a world class young people’s centre in the heart of Mansfield, Nottinghamshire.
The project includes an extension over two floors which houses rooms for multi-media gaming zones, music and dance.
Crich Tramway Museum
| Client: | National Tramway Museum |
| Value: | £1m |
| Location: | Crich, Derbyshire |
This project involved the refurbishment of a disused stone workshop that once served George Stephenson’s Railway to create an Exhibition and Learning Centre.
The newly restored building will link to the existing Workshop Viewing Gallery via an enclosed walkway.
Bilston Town Hall
| Client: | Wolverhampton City Council |
| Value: | £1.6m |
| Location: | Wolverhampton |
This Grade II Listed building project included getting the original clock ticking again, refurbishing the ballroom and stage to its former glory, restoring and repairing the roof, chimneys and stonework.
Retail
Retail Outlet
| Client: | Lidl GmbH |
| Value: | £1.2m |
| Location: | Coventry |
This project involved the D&B of a 1,700m2 retail outlet with an 80 space car parking facility, service yard and loading bay.
The project was delivered on a fast track 21 week programme.
Retail Outlet
| Client: | Sainsburys |
| Value: | £4.1m |
| Location: | Wombourne, Wolverhampton |
This D&B project consisted of a new 38,000 sq ft supermarket with car parking spaces for 234 vehicles.
The works included rainwater harvesting and sustainable drainage together with a new highway junction to access the store.
Wickes and Aldi Retail Units
| Client: | Liberty Mercian Developments Limited |
| Value: | £4.1m |
| Location: | Telford |
This project involves the design and construction of 47,320 sq ft of retail floor area with a 182 space car parking facility.
The new units will provide retail space for Wickes and a Aldi Store.
SUSTAINABILITY
Think Low carbon Centre
| Client: | Barnsley College, Barnsley | |||
| Value: | £3m | BREEAM: | Excellent | |
|
Sustainable Features: This project included the construction of a two storey, Think Low Carbon (TLC) Centre, including workshops, to provide practical demonstrations for individuals and act as a knowledge hub for SME´s within the region to show how their carbon and energy usage can be reduced in new and existing buildings. |
||||
Sustainable Projects
A sample of our experience over the various aspects of sustainability are shown in the chart above.
Creswell Crags Visitors Centre
| Client: | Creswell, Worksop | |||
| Value: | £3.8m | BREEAM: | Very Good | |
|
Sustainable Features: Ground Source Heating, Rainwater Harvesting. |
||||
Transportation Bridges & Structures
Ring Road Re-development
| Client: | Derby Riverlights Limited |
| Value: | £3.0m |
| Location: | Derby |
This project involved the substantial re-configuration of Derby’s busy inner ring road to provide a gateway to the major £300 million retail and leisure development. Works also included new highways, footways, landscaped areas, traffic and pedestrian facilities, lighting, furniture, drainage and utilities services.
Willington Marina
| Client: | Mercia Marina |
| Value: | £1.5m |
| Location: | Willington, Derby |
This project involved the design and construction of a new bridge and hard and soft landscaping
As part of the initial phases of development, this project required highway alterations to the nearby junctions.
Shirebrook Colliery
| Client: | East Midlands Development Agency |
| Value: | £6.7m |
| Location: | Shirebrook, Derbyshire |
This project involved the construction of a new 1.50km long and 7.30m wide carriageway link road into the former Shirebrook Colliery site.
The scheme also included enabling works, drainage, lighting and major infrastructure.
CAREERS
Careers
Training is central to the Tomlinson ethos. We're committed to all aspects of personal and career development right across the group, from training students considering a career in the construction industry to making sure our staff are given every opportunity to bring out their full potential.
We also believe that, wherever possible, it's vital to promote from within when a vacancy comes up. It's important to our staff because they know they can realise their career ambitions with Tomlinson's. And it's important to us because holding on to a dedicated and highly qualified team is the surest way of satisfying the endlessly diverse needs of our clients.
Click here to view our latest vacancies
CAREERS
Technical Trainees
The Tomlinson Group have placements aimed at students coming to the end of their secondary education who wish to embark upon a career in the construction industry.
Successful applicants will be employed to work alongside professionals in key areas of the business including; Estimating, Quantity Surveying and Contracts Management whilst undertaking an appropriate course in Construction on a day release basis.
We are looking for bright enthusiastic individuals with strong GCSE’s grades (including Maths, Science and English) to join the scheme.
All Technical Trainee placements have now been made for 2011. No vacancies will be available unitl summer 2012.
CAREERS
Trade Apprenticeships
Our three year apprenticeships in joinery, bricklaying and construction allow you to develop your skills by working alongside our skilled and experienced crafts people whilst studying your City & Guilds chosen craft. Interviews for candidates who have passed an assessment exam will be in June/July with a view to an appointment by the 1st September in readiness for the start of the College academic year.
Derby
All Trade Apprenticeship placements have now been made for 2011 and 2012. No vacancies will therefore be available unitl Summer 2013.
We are currently working with Nottingham Futures to take on an apprentice between the contractors on the East Midlands Property Alliance Framework, for further details on this placement please visit:
Birmingham
All Trade Apprenticeship placements have now been made for 2011 and 2012. No vacancies will therefore be available unitl Summer 2012.
Vacancies
Vacancies
Page:

VALUES
Respect for People
Respecting the benefits of working with good employees, sub-contractors and clients, and considering the wider community during our activities.
Quality
Caring for our clients and our people in the delivery of measurable outcomes on time and within budget.
Expertise
Promoting knowledge based solutions that can complement and add real value to a client’s construction, building refurbishment or civil engineering project. experience.
Professional
Qualified recommendations and working practices through the employment of intelligent, highly skilled people working together as a team.
Integrity
Protecting our reputation with an honest and fair approach to the way we conduct our business relationships.
Innovation
Exceeding client expectations in delivering focused building or civil engineering solutions relevant to the overall brief.
Flexibility
Creating positive recommendations to changing requirements, adding value to the client.
NEWS
22.04.13 - G F Tomlinson named Contractor of the Year at the CIOB Awards 2013
On Friday 12th April, the fourth Committed to Construction in the East Midlands Awards dinner took place at the Crowne Plaza, Nottingham held by the Chartered Institute of Building working…
09.04.13 - G F TOMLINSON NOMINATED FOR FOUR CIOB EAST MIDLANDS AWARDS 2013
G F Tomlinson have been shortlisted for four CIOB 'Committed to Construction in the East Midlands' Awards, highlighting our commitment to achieving high standards in the industry. Two projects have been…
18.03.13 - REGENT COLLEGE, LEICESTER'S SPORTS HALL UNDERWAY
Staff and students watched as work got under way on a £2.9 million college sports hall. The sports hall at Regent College, Leicester, will include badminton, tennis, basketball and netball courts,…
NEWS
04.03.13 - CROMFORD MILL REGENERATION PROJECT GETS UNDERWAY
The Lord Lieutenant of the County joined the High Sherriff and the Leader of the County Council this week to celebrate the start of works for the Derwent Valley Mills Creative Cluster and Gateway Project at Cromford…
07.12.12 - TOMLINSON’S STAFF BRANCHED OUT AT A WILDLIFE TRUST EVENT
Staff members of G F Tomlinson and over 50 corporate members joined the wildlife trust to help cut back trees and bushes within Rose End Meadows nature reserve in Derbyshire. This project was carried out…
07.08.12 - Tomlinson Titanics take to the River Trent
G F Tomlinson took part in the fourth annual Nottingham Dragon Boat Challenge which took place on Sunday 5th August 2012 in aid of Rainbows Hospice for Children and Young People. The Dragon Boat Challenge…
NEWS
07.08.12 - Tomlinson Help Nicola Support Ivy House
Derby based construction Company G F Tomlinson came to the rescue recently by donating one of their site vehicles to help support a local hospital worker, Nicola Kohut, who is embarking on a charity cycling trip…
22.03.12 - Restoration Man is Thinking Low Carbon
The newly completed Think Low Carbon Centre at Barnsley College was officially opened by Frank Johnston Chair of Governors, Lord Redesdale and Channel 4’s very own Restoration Man, George Clarke. The Centre’s…
03.01.12 - Pledging to deliver construction skills for the future
27 local companies have pledged to boost skills training for young people with a view to delivering construction and housing improvements including sustainable “green” technologies in more homes and…
NEWS
01.09.11 - IMH News - An Update on the Institute of Mental Health Project, Nottingham
G F Tomlinson are working with The University of Nottingham and Nottinghamshire Healthcare Trust to provide a new facility for The Institute of Mental Health. Please see the attachment below - IMH…
28.07.11 - New £1m Centre Boosts Tramway Attraction
THE man who introduced trams to Britain was an American... called George Train and trams were needed to replace horses because of the piles of dung the animals left in the streets. You might not know these…
08.04.11 - Start date set for Chase Leisure Centre work
A start date has been set for work on the major modernisation and refurbishment of Chase Leisure Centre with construction contractor G F Tomlinson Building Limited starting work at the leisure centre in…
NEWS

POLICIES
Health, safety, environmental & quality
The Tomlinson Group has an Integrated Management System that links Environmental (BS EN ISO 14001), Quality (BS EN ISO 9001) and Health and Safety (OHSAS 18001) under the UKAS accredited system, giving equal importance to each other in the construction process. It deals with all aspects of Health, Safety, Environmental & Quality all under a single policy. It is a fully integrated system approved by UKAS accredited external auditors.
POLICIES
Corporate Social Responsibility
As part of our commitment to Corporate Social Responsibility we use modern methods of construction wherever possible so that our construction activities have the least effect on the proximity of the area. It also extends to our staff by giving added value to their employment and also to the local communities where we work, as well as neighbouring occupants.
"On behalf of the Bonsall & Derbyshire Dales Link of Chernobyl Children Life Line, I would like to thank Tomlinson's very much once again for sponsoring our charity. As a volunteer children's charity group, we would find it very difficult to be able to keep going with our work without the support of companies like yours." Chris Broome, Chernobyl Children Life Line Charity
"I am writing to inform you that I have found Tomlinson's to have been thoughtful and have worked hard to ensure that the large construction project being undertaken has had little impact as possible on the day to day running of the school." Mrs R E Lawrence, Head Teacher, St Alban's Church of England Primary School.
POLICIES
Community care policy
Many people are affected when construction work moves into their area. They can be affected by noise, dust, fumes, additional traffic, pavement congestion and road closures, amongst other nuisance factors. However the Tomlinson Group has a Community Care Policy in place to minimise all their construction activities within the vicinity of their operations.
POLICIES
Equality
The company is an Equal Opportunities Employer and our policy is in line with the requirements of the new Equality Act 2010, which became law on the 1st October 2010. Our aim is to ensure that no job applicant, employee or other third party is the subject of discrimination, harassment, victimisation or receives less favourable treatment on the grounds of age, disability, gender reassignment, marriage and civil partnership, race, religion or belief, sex or sexual orientation.
Our policy is continually monitored and reviewed to ensure we remain fully compliant and committed to a programme of action so that we make this policy truly effective.
Page:

CONTACT US
G F Tomlinson Group Ltd
Tomlinson House
Duffield Road
Little Eaton
Derby. DE21 5DR
T: 01332 833100 - F: 01332 830357 - View map
G F Tomlinson & Sons Ltd
Tomlinson House
Duffield Road
Little Eaton
Derby. DE21 5DR
T: 01332 831600 - F: 01332 833987 - View map
G F Tomlinson Building Ltd
Tomlinson House
100 Alfreton Road
Derby
DE21 4AG
T: 01332 342202 - F: 01332 227589 - View map
G F Tomlinson & Sons Ltd
Tomlinson House
Rainbow Hill
Worcester
WR3 8LX
T: 01905 610041 - F: 01905 734827 - View map
G F Tomlinson Birmingham Ltd
329 Tyburn Road
Erdington.
Birmingham. B24 8HJ
T: 0121 327 2660 - F: 0121 327 3110 - View map
To email us please click here.
GET IN TOUCH